Reinventing Lifting Operations
Verton unlocks improvements in safety and productivity, with our world-first range of remote-controlled load-management systems.
Using Verton’s revolutionary gyroscopic technology, creating an output torque, precisely rotating and holding suspended loads without the need for taglines. Eliminating inefficient, costly, and unsafe practices from your lifting operations.

Verton’s load orientation solutions are solving critical issues associated with your lifting operations.
About Us
Together we are raising the bar and reinventing lifting operations.
Our Solutions
Integrating traditional engineering with digital and disruptive technology.
EVEREST Series
Remote load orientation solutions making the same job safer, faster, and smarter

Verton In Action

Smith Cranes & Construction
Verton’s Everest Series eliminated taglines, improving site safety and productivity. Removing workers from high hazard areas and being in contact with suspended loads. Smith cranes was able to finish 3 months ahead of schedule with Verton’s remote load control system.
“The Verton unit has removed our guys from harm’s way and improved our productivity at the same time. Its just brilliant.”
-Chris Burrowes, representative at Smith Cranes, New Zealand

Roy Hill Mining
“Safety is #1 thanks to the Verton’s Everest 6 when replacing and installing 18 tonne transformers, because there was no need for taglines during the lift and we were able to keep the riggers out of the line of fire during lifting operations.”
- Jeremy Whiting, Crane Superintendent at Kutharra Cranes

Hale Steel
Verton’s Everest series was used by Hale Steel during the construction of a distribution centre, installing prefabricated module wall panels on site in Little Rock, Arkansas. Installing eight modular panels for one of the 14,400 sqft walls would usually take six days, but Hale was able to do it in just three day using Verton’s lifting solutions.
“Verton’s products truly are effective and efficient with rigging and protecting our most valuable assets (our employees). Thank you Verton for innovating such a unique product”
- Robert Hale, Vice President, Hale Steel
Our unique solutions improve your lifting safety while delivering a ROI of at least 25% per month.